Which three of these factors should the network operator consider to minimize the impact of adding a new switch?
Which configuration should be applied for the link between R1 and ISP2 to be preferred for incoming traffic (ISP2 to R1)?
what is the maximum number of queries R3 will receive for 192.168.1.0/24, assuming that all the packets sent during convergence…?