Skip to content
Equizzing
Home
Quiz Categories
Linux Entry Level LPI Level 1 LPI Level 2 LPI Level 3
Contact

Study tips 642-813

Put the highest level at the top and the lowest level at the bottom.

Drag the choices on the left to the boxes on the right that should be included when creating a VLAN-based implementation plan.

You have been tasked with planning a VLAN solution that will connect a server in one building to serveral hosts in another building.

You are required to accomplish the following tasks:

You must accomplish the following tasks?

Which port state is interface Fa0/2 of switch SW-B in for VLANs 1 and 175?

Which Spanning Tree Protocol has been implemented on switch SW-B?

Which port role has Interface Fa0/2 of switch SW-A adopted for VLAN 44?

You have been tasked with implementing the above access control as a pre-condition to installing the servers.

You task is complicated by the fact that you only have full access to DSW1, with isolating the cause of these issues…

Posts navigation

Previous 1 … 3 4 5 … 91 Next
Equizzing
    Privacy Policy

© 2025 Equizzing