You need to meet the requirements

###BeginCaseStudy###

Testlet 1
Topic 5, Contoso
Background
You are the SharePoint server administrator for Contoso, Ltd. Contoso has a SharePoint 2010 environment hosted on SharePoint Online and a separate onpremises SharePoint 2010 farm. You are preparing to upgrade the environments to newer versions of SharePoint. You are also planning to support a hybrid onpremises/cloud deployment that will be available to customers, partners, and third-party vendors.
Contoso collaborates with a partner company, Tailspin Toys, on multiple projects.
Technical Environment
All user groups reside in the existing Active Directory Domain Services (AD DS) domain corp.contoso.com.
The existing SharePoint Online environment is configured as follows:
The SharePoint Online URL assigned by Microsoft is http://contoso.sharepoint.com.
The SharePoint Online Administration Center URL is https://contoso-admin.sharepoint.com.
The user name for the Contoso Office 365 administrator is [email protected].
An existing line-of-business application provides an OData service that is hosted in Microsoft Windows Azure SQL Database.
The site collections are described in the following table.

Business Requirements
The upgraded SharePoint environments must meet the following business requirements:
All SharePoint 2013 features must be available to all users when connecting from inside or outside of the corporate network.
Users of the Partner Projects site collection must be able to share content from their Microsoft Outlook clients and receive content from external users who
send email directly to the site.
The Corporate Projects site collection must be available to internal users who connect from outside of the corporate network and must not require a VPN
connection.
Third-party vendors must be able to read and modify documents.
Technical Requirements
You must meet the following technical requirements:
Before upgrading the Partner Projects site collection, create a duplicate, upgraded copy of the site for review and verification purposes.
Use Active Directory Federation Services (AD FS) 2.0 to authenticate Contoso employees, partners, and customers.

Automate the sign-in experience by using the local AD FS 2.0 servers for AD FS single sign-on (SSO).
Ensure that a web usage report that contains traffic reports, search reports, and inventory reports can be provided for any site.
The upgraded SharePoint environments must meet the following technical requirements:
All user profile information that resides in Active Directory must be available in SharePoint Online.
All sites must be able to share a mail-enabled document library that resides in the cloud.
The existing line-of-business application must be consumed as an external content type by using Microsoft Business Connectivity Services (BCS).
The Partner Projects site collection must allow Contoso and Tailspin Toys users to share documents with third-party vendors on an ad-hoc basis, without incurring
additional licensing requirements.

###EndCaseStudy###

A company’s SharePoint environment contains three web applications.
The company must record the following information for each document in any of the three web applications:
The date and time at which the document was last reviewed.

Additional custom date and time information as requirements are identified.
You have the following requirements:
Ensure that the current information is available when searching content and for refining search results.
Ensure that the additional custom date and time information can be assigned to content in all web applications.
Ensure that SharePoint users who are not farm administrators can record additional date and time information as required.
You need to meet the requirements. What should you do?

###BeginCaseStudy###

Testlet 1
Topic 5, Contoso
Background
You are the SharePoint server administrator for Contoso, Ltd. Contoso has a SharePoint 2010 environment hosted on SharePoint Online and a separate onpremises SharePoint 2010 farm. You are preparing to upgrade the environments to newer versions of SharePoint. You are also planning to support a hybrid onpremises/cloud deployment that will be available to customers, partners, and third-party vendors.
Contoso collaborates with a partner company, Tailspin Toys, on multiple projects.
Technical Environment
All user groups reside in the existing Active Directory Domain Services (AD DS) domain corp.contoso.com.
The existing SharePoint Online environment is configured as follows:
The SharePoint Online URL assigned by Microsoft is http://contoso.sharepoint.com.
The SharePoint Online Administration Center URL is https://contoso-admin.sharepoint.com.
The user name for the Contoso Office 365 administrator is [email protected].
An existing line-of-business application provides an OData service that is hosted in Microsoft Windows Azure SQL Database.
The site collections are described in the following table.

Business Requirements
The upgraded SharePoint environments must meet the following business requirements:
All SharePoint 2013 features must be available to all users when connecting from inside or outside of the corporate network.
Users of the Partner Projects site collection must be able to share content from their Microsoft Outlook clients and receive content from external users who
send email directly to the site.
The Corporate Projects site collection must be available to internal users who connect from outside of the corporate network and must not require a VPN
connection.
Third-party vendors must be able to read and modify documents.
Technical Requirements
You must meet the following technical requirements:
Before upgrading the Partner Projects site collection, create a duplicate, upgraded copy of the site for review and verification purposes.
Use Active Directory Federation Services (AD FS) 2.0 to authenticate Contoso employees, partners, and customers.

Automate the sign-in experience by using the local AD FS 2.0 servers for AD FS single sign-on (SSO).
Ensure that a web usage report that contains traffic reports, search reports, and inventory reports can be provided for any site.
The upgraded SharePoint environments must meet the following technical requirements:
All user profile information that resides in Active Directory must be available in SharePoint Online.
All sites must be able to share a mail-enabled document library that resides in the cloud.
The existing line-of-business application must be consumed as an external content type by using Microsoft Business Connectivity Services (BCS).
The Partner Projects site collection must allow Contoso and Tailspin Toys users to share documents with third-party vendors on an ad-hoc basis, without incurring
additional licensing requirements.

###EndCaseStudy###

A company’s SharePoint environment contains three web applications.
The company must record the following information for each document in any of the three web applications:
The date and time at which the document was last reviewed.

Additional custom date and time information as requirements are identified.
You have the following requirements:
Ensure that the current information is available when searching content and for refining search results.
Ensure that the additional custom date and time information can be assigned to content in all web applications.
Ensure that SharePoint users who are not farm administrators can record additional date and time information as required.
You need to meet the requirements. What should you do?

A.
Create a column of data type Date and Time in a document library in each site collection.

B.
In Central Administration, create a term set with a term of data type Date and Time.

C.
Create a content type that uses a custom field of data type Date and Time in each site collection.

D.
Create a site column of data type Date and Time in each site collection.



Leave a Reply 0

Your email address will not be published. Required fields are marked *