DRAG DROP
You manage a solution deployed in two Azure subscriptions for testing and production. Both subscriptions have
virtual networks named fabVNet.
You plan to add two new virtual machines (VMs) in a new subnet.
You have the following requirements:
Deploy the new VMs to the virtual network in the testing subscription.
Minimize any errors in defining the network changes.
Minimize the work that will be required when the change is made to the production virtual network.
Which three steps should you perform in sequence? To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.
Select and Place:
Explanation:
Create a subnet in the Testing subnet, Deploy the VMs to this new subnet, and Export the network
configuration for later importing it to Production.http://msdn.microsoft.com/en-us/library/azure/jj156206.aspx