DRAG DROP
Your company has two offices. Each office is configured as an Active Directory site. The sites are
named Site1 and Site2.
You have an Exchange Server 2013 organization that is configured as shown in the following exhibit.
Datacenter Activation Coordination (DAC) mode is enabled on the database availability group (DAG)
named DAG1.
You are testing a site failover by shutting down all of the servers in Site1.
You need to mount the databases in Site2.
Which three commands should you run in sequence? (To answer, move the appropriate three
commands from the list of commands to the answer area and arrange them in the correct order.)
Explanation:
stop everything in site 1 and restore it to site 2
Start-Service clussvc is included in Restore-DatabaseAvailabilityGroup, no need to run separately.
Answer correct.