###BeginCaseStudy###
Case Study: 1
Contoso, Ltd
Overview
Contoso, Ltd., is a recruiting and staffing company that has offices throughout North
America.
The company has a main office and six branch offices. The main office is located in Miami.
The branch offices are located in New York. Seattle, Los Angeles, Montreal, Toronto, and
Vancouver.
Existing Environment
Network Infrastructure
The network contains one Active Directory domain named contoso.com.
The main office has the following servers:
• One file server that maintains multiples shares
• Two domain controllers configured as DNS servers
• One Windows Server Update Services (WSUS) server
• Two DHCP servers that each have a scope for all of the subnets
• Two servers that have Failover Clustering configured and are used as virtualization
hosts
• One server that has Microsoft SQL Server 2012 installed and maintains a customer
relationship management (CRM) database
Each branch office has the following servers:
• One domain controller configured as a DNS server
• One DHCP server that has a signals scope for its respective office
Each office has a single subnet. The network speed of the local area network (LAN) is 1
gigabit per second. All of the offices have a high-speed connection to the Internet. The
offices connect to each other by using VPN appliances.
Current Issues
Users report that it can take a long time to download files from network shares in the main
office.
A root cause analysis identifies that network traffic peaks when the users experience this
issue.
Requirements
Planned Changes
The company plans to implement the following changes:
• Replace all of the domain controllers with new servers that run Windows Server 2012.
• Upgrade the CRM application to use a web-based application that connects to the
current CRM database. The web application will store session data in the memory of
each web server.
• Initially, deploy two front-end web servers to two virtual machines. Additional virtual
web servers will be deployed in the future.
• Monitor the availability of the CRM application and create alerts when the overall
availability is less than 99 percent.
• Implement Microsoft System Center 2012 to manage the new environment.
Business Requirements
The company identifies the following business requirements:
• Minimize hardware costs and software costs whenever possible.
• Minimize the amount of network traffic over the VPN whenever possible.
• Ensure that the users in the branch offices can access files currently on the main office
file server if an Internet link fails.
Technical Requirements
The company identifies the following technical requirements:
• Provide a highly available DHCP solution.
• Maintain a central database that contains the security events from all of the servers.
The database must be encrypted.
• Ensure that an administrator in the main office can manage the approval of Windows
updates and updates to third-party applications for all of the users.
• Ensure that all of the domain controllers have the ReliableTimeSource registry value
in HKEY_LOCAL_MACHINE
\SYSTEM\CurrentControlSet\Services\W32Time\Parameters set to 1, even if an
administrator changes that value manually.
Virtualization Requirements
The company identifies the following virtualization requirements:
• Minimize the number of permissions and privileges assigned to users.
• Ensure that the members of a group named Group2 can add a WSUS server to the
fabric.
• Ensure that a diagram view of the virtualization environment can be generated
dynamically.
• Minimize the amount of administrative effort required to manage the virtualization
environment.
• Prevent the failure of a front-end web server from affecting the availability of the
CRM application.
• Ensure that the members of a group named Group1 can create new virtual machines in
the Los Angeles office only.
• Only create virtual machine templates by using objects that already exist in the
System Center 2012 Virtual Machine Manager (VMM) library.
• On the failover cluster in the main office, apply limited distribution release (LDR)
updates to the virtualization hosts without disrupting the virtual machines hosted on
the virtualization hosts.
###EndCaseStudy###
You need to recommend a solution for managing updates. The solution must meet the
technical requirements.
What should you include in the recommendation?
A.
A System Center 2012 Configuration Manager management point in the main office and a
WSUS downstream server in each office
B.
A System Center 2012 Configuration Manager software update point in the main office
and a System Center 2012 Configuration Manager distribution point in each office
C.
A System Center 2012 Configuration Manager management point in the main office and a
System Center 2012 Configuration Manager distribution point in each office
D.
A WSUS upstream server in the main office and a WSUS downstream server in each
office
https://technet.microsoft.com/en-US/library/gg682106.aspx
B
According with the link provided I agree that it should be B.
as a SCCM 2012 certified specialist I agree with Pio and Unknown.
Answer B