Which of the following is a temporary approval to operate based on an assessment of the implementation status of the assigned IA Controls

Which of the following is a temporary approval to operate based on an assessment of the
implementation status of the assigned IA Controls

Which of the following is a temporary approval to operate based on an assessment of the
implementation status of the assigned IA Controls

A.
IATO

B.
DATO

C.
ATO

D.
IATT



Leave a Reply 0

Your email address will not be published. Required fields are marked *