Which four actions should you perform in sequence?

You administer a Microsoft SQL Server 2012 clustered instance that has two nodes named Node 1 and Node
2.
Node 1 fails and the cluster fails over to Node 2.
You need to replace Node 1 and add it to the cluster.
Which four actions should you perform in sequence? (To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)

Build List and Reorder:

You administer a Microsoft SQL Server 2012 clustered instance that has two nodes named Node 1 and Node
2.
Node 1 fails and the cluster fails over to Node 2.
You need to replace Node 1 and add it to the cluster.
Which four actions should you perform in sequence? (To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)

Build List and Reorder:

Answer:

Explanation:

Reference: http://technet.microsoft.com/en-us/library/ms181075.aspx



Leave a Reply 6

Your email address will not be published. Required fields are marked *


SR

SR

The question is acking which four actions…so I think the asnwer is:
1. Evict node 1..
2. Install Windows on a new server..
3. Run Cluster administrator setup to add node 1..
4. Run Sql server setup to add Node 1 to the failover cluster

Beacuse Node 1 must be replaced with a new one.
Please correct me if i’m wrong..tnx

Dazed_by_jzed

Dazed_by_jzed

@jzed: u’re a fool! Bloody lazy m$#@&r-furger!!

Suprised_by_Dazed_by_jzed

Suprised_by_Dazed_by_jzed

@Dazed_by_jzed: This comment doesn’t add anything to the question… I mean we are all here for the same reason. There’s no excuse to demoralize someone for asking a question.