You administer a Microsoft SQL Server 2012 clustered instance that has two nodes named Node 1 and Node
2.
Node 1 fails and the cluster fails over to Node 2.
You need to replace Node 1 and add it to the cluster.
Which four actions should you perform in sequence? (To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)
Build List and Reorder:
Answer:
Explanation:
Reference: http://technet.microsoft.com/en-us/library/ms181075.aspx
The question is acking which four actions…so I think the asnwer is:
1. Evict node 1..
2. Install Windows on a new server..
3. Run Cluster administrator setup to add node 1..
4. Run Sql server setup to add Node 1 to the failover cluster
Beacuse Node 1 must be replaced with a new one.
Please correct me if i’m wrong..tnx
The reference he gave tells you the steps.
1) evict
2) Install new windows
3) Using the Failover Cluster Manager snap-in, add Node 1 to the existing cluster.
4) Run SQL Server Setup to add Node 1 to failover cluster.
https://technet.microsoft.com/en-us/library/ms181075.aspx
is this correct?
https://technet.microsoft.com/en-us/library/ms181075.aspx
@jzed: u’re a fool! Bloody lazy m$#@&r-furger!!
@Dazed_by_jzed: This comment doesn’t add anything to the question… I mean we are all here for the same reason. There’s no excuse to demoralize someone for asking a question.