Your network environment includes a Team FoundationServer (TFS) 2012 named TFS1 that contains two
project collections named PC1 and PC2. A build server named Bi is configured with a build controller named
C1 and an agent named A1 that runs build definitions created in Pd. A development team wants to createa
gated check-in build definition on PC2. You need toperform a supported infrastructure enhancement to run
PC2 build definitions. What should you do?
A.
· Add a new build server (B2).
· On the B2 build server, migrate controller C1 andinstall a new controller (C2) that connects to thePC2
project collection.
· On the Bi build server, configure a second build agent (A2) that uses the C2 controller.
B.
· Add a new build server (B2).
· On the B2 build server, install a build controller (C2) that connects to the PC2 project collection.
· On the B2 build server, configure a second build agent (A2) that uses the C2 controller.
C.
· On the Bi build server, configure the C1 controller to connect to project collections PC1 and PC2.
· On the Bi build server, update the Al agent to use controllers C1 and C2.
D.
· On the Bi build server, configure the C1 controller to connect to project collections PC1 and PC2.
· On the Bi build server, configure a second build agent (A2) that uses the C2 controller.