You need to configure VS1 to shut down each virtual machine before the server shuts down

Your company has a server named VS1 that runs Windows Server 2008 and Microsoft Hyper-V. VS1
hosts 10 virtual machines. You need to configure VS1 to shut down each virtual machine before the
server shuts down. What should you do?

Your company has a server named VS1 that runs Windows Server 2008 and Microsoft Hyper-V. VS1
hosts 10 virtual machines. You need to configure VS1 to shut down each virtual machine before the
server shuts down. What should you do?

A.
Create a shutdown script on each virtual machine.

B.
Install Integration Services on each virtual machine.

C.
Enable the Turn off the virtual machine option in the Automatic stop action properties on each
virtual machine.

D.
Enable the Shut down the guest operating system option in the Automatic stop action properties
on each virtual machine.



Leave a Reply 0

Your email address will not be published. Required fields are marked *