Which actions should you perform in sequence?

DRAG DROP
A company currently has a Remote Desktop Services (RDS) farm consisting of three Remote Desktop
Session Hosts (RD Session Hosts) and one Remote Desktop Session Broker (RD Session Broker). The
RD Session Hosts are configured to use Windows Network Load Balancing.
The RDS servers run slowly every Monday morning between 9:00 A.M. and 11:00 A.M.
You establish that your third-party backup solution is running on the RDS servers at these times and
is causing the poor performance. Company policy mandates that the backup must occur at this time.
You have the following requirements:
• Implement Windows System Resource Manager (WSRM) on each of the RDS servers to
minimize the system resources utilized by the backup Application.
• Ensure that WSRM runs only when required.
You need to configure WSRM.
Which actions should you perform in sequence?
To answer, move the appropriate actions from the list of actions to the answer area and arrange
them in the correct order. (Use only actions that Apply.)

DRAG DROP
A company currently has a Remote Desktop Services (RDS) farm consisting of three Remote Desktop
Session Hosts (RD Session Hosts) and one Remote Desktop Session Broker (RD Session Broker). The
RD Session Hosts are configured to use Windows Network Load Balancing.
The RDS servers run slowly every Monday morning between 9:00 A.M. and 11:00 A.M.
You establish that your third-party backup solution is running on the RDS servers at these times and
is causing the poor performance. Company policy mandates that the backup must occur at this time.
You have the following requirements:
• Implement Windows System Resource Manager (WSRM) on each of the RDS servers to
minimize the system resources utilized by the backup Application.
• Ensure that WSRM runs only when required.
You need to configure WSRM.
Which actions should you perform in sequence?
To answer, move the appropriate actions from the list of actions to the answer area and arrange
them in the correct order. (Use only actions that Apply.)

Answer:

Explanation:

Process Matching Criteria
The WSRM process-matching criteria performance object, installed with Windows System Resource
Manager (WSRM), consists of counters that monitor the CPU usage and memory usage of the
processes matched by the process-matching criteria. The criteria are included in the managing
resource-allocation policy. Each object will have as many instances as the number of processmatching criteria within the current active policy.
Resource Allocation Policy
Allocate processor and memory resources to processes that are specified by the process matching
criteria that you create.
Also see
http ://www.techrepublic.com/article/use-windows-system-resource-manager-to-control-aserverspowers/5178054



Leave a Reply 0

Your email address will not be published. Required fields are marked *