###BeginCaseStudy###
Case Study: 13
School of Fine Art
COMPANY OVERVIEW
School of Fine Art is an educational institution that has a main campus and two satellite campuses.
The main campus is located in New York. The satellite campuses are located in Los Angeles and
Chicago.
PLANNED CHANGES
School of Fine Art plans to deploy a 64-bit line-of-business application named App1 to all users on
the network. App1 must be updated by using the minimum amount of administrative effort.
School of Fine Art plans to centralize the management of all its virtualization technologies.
School of Fine Art plans to implement the following storage requirements for the documents on
Server1:
Archive all of the content on Server 1 that is older than 180 days.
Prevent files that have a specific file type from being uploaded to Server 1.
Automatically send administrators a report by using e-mail that contains a list of the duplicate files
on Server 1.
School of Fine Art plans to implement an auditing solution.
School of Fine Art plans to improve the performance of the PKI infrastructure.
School of Fine Art plans to deploy a Windows Update solution on all client computers.
EXISTING ENVIRONMENT
Business Goals
Minimize software licensing costs.
Existing Active Directory Environment
The network contains a single Active Directory domain named fineartschool.net.
All domain controllers run either Windows Server 2003 or Windows Server 2008 R2. All client
computers run a 32-bit version of Windows 7.
Existing Network Infrastructure
School of Fine Art has a file server named Server1.
The network contains the following virtualization technologies:
VMWare ESX Server
Microsoft Hyper-V Server 2008
Microsoft Virtual Server 2005 R2
The company’s internal Public Key Infrastructure (PKI) contains two servers named CA1 and CA2.
CA1 and CA2 have the Active Directory Certificate Services (AD CS) role service installed.
CA1 is configured as an offline standalone root certification authority (CA). CA2 is configured as an
enterprise subordinate CA. CA2 has been issuing certificates for many years.
REQUIREMENTS
Technical Requirements
School of Fine Art must meet the following technical requirements:
Minimize the amount of time it takes client computers to verify certificates.
Minimize the amount of network bandwidth the client computers use to verify the certificates.
Ensure that only client computers that have the latest Windows updates installed can connect to the
network.
Log each change made to the objects stored in Active Directory. Ensure that the logs contain the
before and after values of all the changes.
Administration Requirements
Administrators report that it takes a long time to manage the virtualization technologies by using the
default administrative tools. A new solution must be implemented to manage the virtualization
technologies.
###EndCaseStudy###
You need to recommend a strategy for App1 that supports the company’s planned changes.
What should you include in the recommendation?
A.
Create a Group Policy Object (GPO) that assigns App1 to all of the client computers.
B.
Create a Group Policy Object (GPO) that publishes App1 to all of the users on the network.
C.
Deploy Windows XP Mode on all of the client computers. Deploy App1 on the virtual machine
(VM).
D.
Deploy App1 on a server that has the Remote Desktop Session Host (RD Session Host) role service
installed.