DRAG DROP
A company has a two-node Microsoft Hyper-V failover cluster that runs Windows Server
2008 R2. The failover cluster has two logical unit numbers (LUNs). One of the LUNs
contains virtual machines (VMs) and is using 90% of the LUN capacity. The other LUN is not
using any capacity. You create a snapshot of a running VM before you upgrade an
application. You delete the snapshot in Hyper-V after you establish that there are no issues
with the application upgrade. you reboot the VM. After a period of time, the VM stops
responding. You need to ensure that the VM is fully operational. Which three actions should
you perform in sequence? (To answer, move the appropriate actions from the list of answer
choices to the answer area and arrange them in the correct order.)
Explanation:
Answer changed 13/06/2012 FROM
– Off
– Migrate the VM to the free storage (LUN)
– Power On after merger completes
TO
– Power off
– Power On after merge completes
– Live migration to the free storage (LUN)