You work as a Network Administrator for Perfect World Inc. The company has a TCP/IP-based
network. The network is configured on a Ring topology as in the image below:
During a routine checkup on a Monday morning, you find that Server D has failed. You are required
to send the server to the manufacturer for getting it repaired. You take out the server from the
network. What will be your next step, so that other terminals are not affected?
A.
Put a 50 ohm terminator at Server E.
B.
Connect Server C and Server E by using a barrel connector.
C.
Put 50 ohm terminators at Server C and Server E.
D.
Put a 50 ohm terminator at Server C.
Explanation: