Which Cost Update Method should you configure if you wish to replace existing item costs with the supplier’s cost each time a shipment is received and committed?

Which Cost Update Method should you configure if you wish to replace existing item costs with
the supplier’s cost each time a shipment is received and committed?

Which Cost Update Method should you configure if you wish to replace existing item costs with
the supplier’s cost each time a shipment is received and committed?

A.
Last Cost

B.
Weighted Average

C.
LIFO

D.
None (manually updated)