You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics
AX 2012 in their production environment.
You are in the process of setting up a budget control. You have been instructed to make sure that
the control produces a warning a certain percentage of the budget funds have been depleted.
What two actions you should take? (Choose two.)
A.
You should consider configuring the over-budget permissions for user groups setting.
B.
You should consider configuring the budget threshold setting.
C.
You should consider configuring the use of the Carry-forward budget.
D.
You should consider selecting Display a message when exceeding budget threshold check box.
Explanation: