You have a bill of materials (BOM) item that has several components.
You specify the measurements of a BOM component.
You need to identify when the measurements of a BOM component are calculated.
What are two possible events that will cause the measurements to be calculated?
Each correct answer presents a complete solution.

You have a bill of materials (BOM) item that has several components.
You specify the measurements of a BOM component.
You need to identify when the measurements of a BOM component are calculated.
What are two possible events that will cause the measurements to be calculated?
Each correct answer presents a complete solution.

A.
When a cost group is added to the costing sheet

B.
When a cost estimation is run in the production order

C.
When a calculation group is linked to the item of a BOM component

D.
When a calculation is run on the BOM line