What is the status of the switch?

Refer to the exhibit.

After the power-on self test (POST), the system LED of a Cisco 2950 switch
turns amber. What is the status of the switch?

Refer to the exhibit.

After the power-on self test (POST), the system LED of a Cisco 2950 switch
turns amber. What is the status of the switch?

A.
The POST was successful.

B.
The switch has a problem with the internal power supply and needs an external power supply to
be attached.

C.
POST failed and there is a problem that prevents the operating system of the switch from being
loaded.

D.
The switch has experienced an internal problem but data can still be forwarded at a slower rate.

E.
The switch passed POST, but all the switch ports are busy.