A customer wants to deploy single-hop FCoE in the data center using Cisco Nexus 5500 switches.
Which three configuration steps are needed for this deployment? (Choose three.)

A customer wants to deploy single-hop FCoE in the data center using Cisco Nexus 5500 switches.
Which three configuration steps are needed for this deployment? (Choose three.)

A.
Enable the FCoE feature on the Cisco Nexus 5500.

B.
Configure FCoE VSAN to VLAN mapping.

C.
Configure the virtual Fibre Channel interface.

D.
Configure FCoE-NPV mode on the Cisco Nexus 5500.

E.
Configure the storage VDC for FCoE.

F.
Enable NPV on the Cisco Nexus 5500.