How should the transmit power on an access point and client each be set during a site survey?

How should the transmit power on an access point and client each be set during a site survey?

How should the transmit power on an access point and client each be set during a site survey?

A.
at 30mW

B.
matched to the antenna gain

C.
differing by at least 20 dBi

D.
matched to each other



Leave a Reply 0

Your email address will not be published. Required fields are marked *