You have a multinational customer that would like you to perform a wireless site survey for a new
manufacturing facility in Singapore. They have had a local vendor install a point-to-point wireless bridge link
between two buildings 1 km apart. The ground between the buildings is flat but because facilities are in the
mountains, dense fog is an issue. There are no lineof sight issues between the buildings. The link is
experiencing errors and throughput issues. Currently the two radios are set to operate at 2.4 GHz and the
transmit power is set to 7 dBm with 7 dBm antennas.What do you need to take into consideration when
performing the site survey for this link?
A.
Change the radio power to 17 dBm.
B.
Change the radio power to 20 dBm and replace witha 16 dBm antenna.
C.
Change the radio power to 29 dBm.
D.
Change the radio power to 13 dBm.