Given an AP that can transmit at 100 mW and the client at 40 mW, which power setting should be
used for a site survey?
A.
10 mW
B.
20 mW
C.
40 mW
D.
60 mW
E.
80 mW
F.
100 mW
Explanation:
Given an AP that can transmit at 100 mW and the client at 40 mW, which power setting should be
used for a site survey?
Given an AP that can transmit at 100 mW and the client at 40 mW, which power setting should be
used for a site survey?
A.
10 mW
B.
20 mW
C.
40 mW
D.
60 mW
E.
80 mW
F.
100 mW
Explanation: