An engineer notes that some areas of a floor fail when using the Location Readiness Tool in Cisco
WCS. What criteria must be met for a point to be considered location ready?
A.
one AP in each quadrant, with three less than 70 feet away
B.
one AP in three quadrants, with two less than 70 feet away
C.
one AP in each quadrant, with two less than 70 feet away
D.
one AP in three quadrants, with one less than 70 feet away