Refer to the exhibit
BPDUGuard is enabled on both ports of SwitchA. Initially, LinkA is connected and forwarding traffic. Anew
LinkB is then attached between SwitchA and HubA. Which two statements about the possible result of
attaching the second link are true? (Choose two)
A.
The switch port attached to LinkB does not transition to up
B.
One or both of the switch ports attached to the hub goes into the err-disabled state when a BPDU is
received
C.
Both switch ports attached to the hub transitionsto the blocking state
D.
A heavy traffic load could cause BPDU transmissions to be blocked and leave a switching loop
E.
The switch port attached to LinkA immediately transitions to the blocking state