Which two of these are correct regarding the recommended practice for distribution layer design?

Which two of these are correct regarding the recommended practice for distribution layer design?
(Choose two.)

Which two of these are correct regarding the recommended practice for distribution layer design?
(Choose two.)

A.
use a redundant link to the core

B.
use a Layer 2 link between distribution switches

C.
never use a redundant link to the core because of convergence issues

D.
use a Layer 3 link between distribution switches with route summarization

E.
use a Layer 3 link between distribution switches without route summarization



Leave a Reply 0

Your email address will not be published. Required fields are marked *