Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?

Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?

C/image:54.png

Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?

C/image:54.png

A.
use a Layer 2 link between distribution switches

B.
use a Layer 3 link between distribution switches

C.
use a redundant link to the core

D.
use a Layer 3 link between distribution switches with route summarization

Explanation:



Leave a Reply 0

Your email address will not be published. Required fields are marked *