Put the Mpls LDP steps on the left into the correct order from top to bottom on the right.

DRAG DROP
Put the Mpls LDP steps on the left into the correct order from top to bottom on the right.

DRAG DROP
Put the Mpls LDP steps on the left into the correct order from top to bottom on the right.

Answer: See the explanation

Explanation:
<map><m
x1=”4″ x2=”401″
y1=”44″ y2=”78″
ss=”0″ a=”0″ /><mx1=”5″ x2=”403″
y1=”88
y2=”116″ ss=”0″ a=”0″ /><m x1=”4″ x2=”400″ y1=”131″ y2=”162″ ss=”0″ a=”0″ /><m x1=”5″
x2=”400″ y1=”173″ y2=”204″ ss=”0″ a=”0″ /><m x1=”518″ x2=”910″ y1=”47″ y2=”76″ ss=”1″ a=”0″
/><m x1=”518″ x2=”911″ y1=”88″ y2=”119″ ss=”1″ a=”0″ /><m x1=”518″ x2=”907″ y1=”130″
y2=”164″ ss=”1″ a=”0″ /><m x1=”518″ x2=”909″ y1=”172″ y2=”204″ ss=”1″ a=”0″ /><c start=”0″
stop=”0″ /><c start=”2″ stop=”1″ /><c start=”3″ stop=”2″ /><c start=”1″ stop=”3″ /></map>
1)Build RIB
2) Assign labels
3) Advertise Labels
4)Build LFIB

1) Build RIB
2) Assign labels
3) Advertise Labels
4) Build LFIB