In a data-center access layer switch failure, which design would help reduce convergence time?

In a data-center access layer switch failure, which design would help reduce convergence time?

In a data-center access layer switch failure, which design would help reduce convergence time?

A.
integrated blade server switches

B.
Cisco Catalyst 4948 Switch in a top-of-rack configuration

C.
Cisco Catalyst 4948 Switch in an end-of-rack configuration

D.
Cisco Catalyst 6506 Switch in an end-of-rack configuration