which two requirements should be confirmed first through a site survey?

You are the network administrator for The Tech LTD, and you are considering a Cisco ACE Module implementation, which two requirements should be confirmed first through a site survey? (Choose two.)

You are the network administrator for The Tech LTD, and you are considering a Cisco ACE Module implementation, which two requirements should be confirmed first through a site survey? (Choose two.)

A.
Cisco Catalyst4500 Switch chassis with an open-fabriC.enabled port Cisco Catalyst 4500 Series Supervisor Engine 4
Cisco IOS Software Release 12.2(31 )SGA or later

B.
Cisco Catalyst 6509 Switch chassis with an open-fabriC.enabled port Cisco Catalyst 6500 Series Supervisor Engine 32
Cisco IOS Software Release 12.2(18)SXF4 or later

C.
Cisco 7600 Switch chassis with an open-fabriC.enabled port Cisco 7600 Series Supervisor Engine 720
Cisco 7600 Series Route Switch Processor 720
Cisco IOS Software Release 12.2(18)SXF4 or later

D.
Cisco Catalyst 6506 Switch chassis with an open-fabriC.enabled port Cisco Catalyst 6500 Series Supervisor Engine 720
Cisco IOS Software Release 12.2(18)SXF4 or later



Leave a Reply 0

Your email address will not be published. Required fields are marked *