Using the default VDC high availability options in the Cisco Nexus 7010 switches, which situation occurs?
A.
if a single supervisor is in use, a graceful restart is forced Build Your Dreams
B.
if dual supervisors are in use, a supervisor switchover is forced.
C.
The VDC is deleted, and no further action is performed.
D.
The VDC is deleted and then re-created with the startup configuration.