A customer with multiple vendor switches establishes an ISL between a non-Cisco switch and an E_Port on a Cisco MDS 9000 switch. Which three statements are true about the interop behavior between the two switches? (Choose three)
A.
Exchange-based load balancing is supported in all interop modes.
B.
Interop mode affects all VSANs.
C.
Only E_Ports can be used to connect to non-Cisco MDS switches.
D.
The non-Cisco switch must have matching FC timers with the VSAN containing the E_Port on the Cisco MDS 9000 Series switch.
E.
Adding another ISL between the switches will allow a PortChannel to be configured for HA.
F.
Interop mode 1 allows full featured communication between all combinations of MDS and non-MDS switches.