What is a typical output of the design planning phase that characterizes an existing data center?

What is a typical output of the design planning phase that characterizes an existing data center?

What is a typical output of the design planning phase that characterizes an existing data center?

A.
a high-level conceptual architecture proposal

B.
a gap analysis

C.
a verification plan

D.
reactive fault detection and correction



Leave a Reply 0

Your email address will not be published. Required fields are marked *