Drag the options on the left to the right side in the correct order when performing the installation.

DRAG DROP
This question concerns the installation of a Cisco Unified Computing System blade server AC power supply.
Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

DRAG DROP
This question concerns the installation of a Cisco Unified Computing System blade server AC power supply.
Drag the options on the left to the right side in the correct order when performing the installation. Note: Not all of the steps on the left will be used.

Explanation:



Leave a Reply 1

Your email address will not be published. Required fields are marked *


Trotro

Trotro

Pictures are missing.
But all question are good in November 2014 🙂