Refer to the exhibit.
Cameras and a Cisco VSM server are connected to a Layer 2 switch.
Which three steps will allow the Cisco VSM servers to see video traffic from the two IP cameras?
(Choose three.)
A.
GigE 0/10 should be configured to accept traffic from all VLANs using the #switchport mode
access vlan all command.
B.
GigE 0/10 should be configured to dynamic mode using the #switchport mode dynamic
desirable command.
C.
Implement “router-on-a-stick”.
D.
Implement inter-VLAN routing.
E.
The link between GigE 0/5 and FE 1/1 should be configured as a trunk port.