A power on self test (POST) should be performed on a computer because the POST:

A power on self test (POST) should be performed on a computer because the POST:

A power on self test (POST) should be performed on a computer because the POST:

A.
validates network configuration.

B.
checks system components and hardware.

C.
checks the boot sector of the hard drive.

D.
checks system software.



Leave a Reply 0

Your email address will not be published. Required fields are marked *