A company is migrating their physical servers to virtual. The administrator is tasked with migrating three servers:
One application server with a dual-core 3.2GHz processor that reaches 50% CPU utilization at peak time.
Two web servers, each with a dual-core 3.2GHz processor, both reaching 70% CPU utilization at peak time.
Currently, the administrator only has two hosts available, so resources will need to be set for the new VMs. Each host has two 2.4GHz quad-core processors. One host is already near maximum capacity, and the second host is at 30% CPU utilization.
Which of the following would be the BEST minimum CPU resources set on the second host for the new VMs?
A.
1,600 MHz for the application server and 2,300 MHz for each web server.
B.
3,300 MHz for the application server and 4,600 MHz for each web server.
C.
3,300 MHz for the application server and 5,250 MHz for each web server.
D.
5,250 MHz for the application server and 7,080 MHZ for each web server.
C.