Which two are true about the use of the Integrated Lights Out Manager (ILOM) on the Database
Machine?
A.
ILOM can be used to power-on the Cisco switch.
B.
ILOM can be used to power on the InfiniBand switches.
C.
ILOM can be used to power-on the database servers.
D.
ILOM generates hardware alerts for the power distribution units.
E.
ILOM provides a remote console for the storage servers.
Explanation:
B:How to monitor the bandwidth of Exadata Infiniband Switch?
There are two ways, the simplest method is to use the Fabric Monitor (ILOM Web Interface), and
the other way is just to use SNMP request.
E:
*The Oracle ILOM Remote Console is supported on all Oracle Sun x86 processor-based servers.
It is also supported on some SPARC processor-based servers. The Oracle ILOM Remote Consoleis a Java application that you can launch from the Oracle ILOM web interface
*Remote Management: Integrated Lights Out Manager (ILOM) Ethernet port
C is also correct. Please help.
I think so, too. C is correct.
Perhaps, B is wrong answer.
ILOM can manage power state of server, but not control cisco and InfiniBand switches.
( At least, control of switches by ILOM have no mentioned in the document.)
===
With ILOM, you can proactively:
– Learn about hardware errors and faults as they occur
– Remotely control the power state of your compute node
– View the graphical and non-graphical consoles for the host
– View the current status of sensors and indicators on the system
– Determine the hardware configuration of your system
– Receive generated alerts about system events in advance via IPMI PETs, SNMP Traps, or E-mail Alerts.
===
We are using exadata and infiniband switche has ilom.
Correct Answers are C & E
C&E
You can get accurate exam guide from http://www.exadata-certification.com
NOT different guide : http://www.exadata-certification.com
c e
c e
C and E for me too
C & E,
Because Infiniband dont get powered on or off by ILOM
To switch them off u need to to turn of PDU supply
A is wrong. Cisco switch do not use ILOM to turn on. it does not have power switch
B is wrong. IB do not use ILOM to turn on. it does not have power switch
C is right. DB server can be powered on/off via ILOM
D is wrong. PDU do not use ILOM to turn on. it does not have power switch
E is right. cell server can be powered on/off via ILOM
So C.E. are correct