Which of the following does NOT need to beaddressed when a technician perform a pre-wire walk through?

Which of the following does NOT need to beaddressed when a technician perform a
pre-wire walk through?

Which of the following does NOT need to beaddressed when a technician perform a
pre-wire walk through?

A.
Outlet design

B.
Panel design

C.
Outlet location

D.
Panel location



Leave a Reply 0

Your email address will not be published. Required fields are marked *