which of the following would be the CPI for the project?

If the EV is $3,000 and the AC is $4,000, which of the following would be the CPI for the project?

If the EV is $3,000 and the AC is $4,000, which of the following would be the CPI for the project?

A.
.50

B.
.75

C.
1.25

D.
1.75