During installation, what happens if both power supplies are not cabled at the same time on a
SPARC T4-2 server?
A.
Nothing
B.
OpenBoot PROM is disabled
C.
The service processor will not power on
D.
The Oracle ILOM will signal a fault
Explanation:
http://docs.oracle.com/cd/E23075_01/html/E23076/z40004b81409406.html(see the
second note on the page)
D
I think is C, because it is not possible ILOM signals a fault due to is power-off
D is correct.
In the question above you can see that one of two cabels mean have connect to the Server, but if just one was cennected than 2nd would be connect what’s happening?-it’s a question.