An administrator is having a hard time adding a new switch to the network. After verifying that all the ports are configured correctly on each switch, which of the following should the administrator verify NEXT?
A.
Straight-through cable is used to connect both switches
B.
Loopback plug is connected
C.
Crossover cable is used to connect both switches
D.
Cable is a rollover cable