A network technician replaced a faulty Ethernet cable. The technician replaced one side of the patch in the incorrect part of the patch panel. Within a few minutes, the technician was informed that users were experiencing slow or no Internet connectivity all over the building. A broadcast storm began.
After removing the replacement cable, which of the following should the technician do NEXT?
A.
Replace the cable during the next maintenance window.
B.
Review labeling and logical network diagram documentation.
C.
Attempt to isolate the storm to the domain by rebooting the switch.
D.
Re-terminate all of the other Ethernet cables on the switch to isolate the issue.