Which of the following are MOST likely the causes of th…

Two office buildings are connected via copper network cabling buried in the ground. During local construction,
the second building suffers a permanent network outage.
Which of the following are MOST likely the causes of the outage? (Select two.)

Two office buildings are connected via copper network cabling buried in the ground. During local construction,
the second building suffers a permanent network outage.
Which of the following are MOST likely the causes of the outage? (Select two.)

A.
Crosstalk

B.
Open circuit

C.
Short circuit

D.
Signal attenuation

E.
Electromagnetic interference



Leave a Reply 0

Your email address will not be published. Required fields are marked *