The data loss was deemed acceptable based on the 2 hour:

Data on a storage system was last replicated at 8:00 AM and the storage system had a major
failure at 9:33 AM. The failure caused all changes to the data between 8:00 AM and 9:33 AM to be
lost. The data loss was deemed acceptable based on the 2 hour:

Data on a storage system was last replicated at 8:00 AM and the storage system had a major
failure at 9:33 AM. The failure caused all changes to the data between 8:00 AM and 9:33 AM to be
lost. The data loss was deemed acceptable based on the 2 hour:

A.
Mean Time to Data Loss (MTDL)

B.
Mean Time Between Failures (MTBF)

C.
Recovery Point Objective (RPO)

D.
Recovery Time Objective (RTO)