which two items should be checked before connecting the fabrics?

When preparing to merge two fabrics, which two items should be checked before connecting the
fabrics? (Choose Two.)

When preparing to merge two fabrics, which two items should be checked before connecting the
fabrics? (Choose Two.)

A.
zones sets are activated

B.
timeout values are set properly

C.
new configurations are enabled to allow the merge

D.
fabrics are co-located to prevent segmentation

E.
interoperability modes are configured per vendor instructions

Explanation:



Leave a Reply 0

Your email address will not be published. Required fields are marked *