A dual controller head storage array is zoned to two different fabrics. How should the administrator
cable up the storage array to ensure redundancy and resiliency?
A.
ISL the FC switches together
B.
Cable both controller heads to one switch
C.
Have at least one path from each controller head going to each fabric
D.
Cable one controller port to one fabric and the other controller port to a second fabric