which of the following should be checked NEXT?

A new storage system with dual storage controllers is added to an HA SAN. The storage
administrator attempts to zone a dual HBA host to the new storage system but can only connect to
the first storage controller on HBA0 and the second storage controller on HBA1. After checking to

ensure the link light is on for the fiber cable connecting the storage to the switch, which of the
following should be checked NEXT?

A new storage system with dual storage controllers is added to an HA SAN. The storage
administrator attempts to zone a dual HBA host to the new storage system but can only connect to
the first storage controller on HBA0 and the second storage controller on HBA1. After checking to

ensure the link light is on for the fiber cable connecting the storage to the switch, which of the
following should be checked NEXT?

A.
That multipath software has been installed and configured on the host

B.
That the SFP connectors are on the fibre channel switches

C.
That a port from each storage controller is connected to each fabric

D.
That the fiber cables from the host HBAs are connected to the switch ports



Leave a Reply 0

Your email address will not be published. Required fields are marked *