When replacing an HBA, which two steps should be performed prior to connecting the HBA to the fabric? (Choose two.)

When replacing an HBA, which two steps should be performed prior to connecting the HBA to the fabric? (Choose two.)

When replacing an HBA, which two steps should be performed prior to connecting the HBA to the fabric? (Choose two.)

A.
activate the zone set

B.
disable zoning for the old HBA

C.
update the alias map with the new WWN

D.
create a new zone for the old HBA to ensure isolation of the defective component

E.
rename the active zone(s) to match the new HBA’s WWN



Leave a Reply 0

Your email address will not be published. Required fields are marked *