which of the following?

After a server has been installed into a rack, an administrator must ensure which of the following?

After a server has been installed into a rack, an administrator must ensure which of the following?

A.
Warm air flow is permitted through the front bezel

B.
The system is labeled so that it can be identified

C.
Verify the change control process can be implemented

D.
Determine the correct power requirements

Explanation: