An administrator will replace five current servers. Which of the following is the MOST important to
review before installing new servers?
A.
Verify uninterruptible power supply (UPS) load
B.
Verify if server consumes 220V
C.
Verify CPU load
D.
Verify if server consumes 110V
NOS wise install the answer should be C but not sure.
A. Verify uninterruptible power supply (UPS) load
I’d say A as it says installing the new servers but not converting over to them.
A.
Verify uninterruptible power supply (UPS) load
I have the same idea. A